FALLBACK 2-Hour Workflow
Block
Elapsed
00:00
Risk
Phase

Compressed execution in 120 minutes.

Not a lighter day. A protocol that protects every gate-critical input when time is tight. Four blocks. Four locks. One readiness streak preserved.
Total 2 hrs 4 sequential blocks Process Score earnable DRC streak preserved
Today's Phase — sets Block 3 content
Phase 1Backtest (D 1–30)
Phase 2Live Sim (D 31–42)
Phase 3Readiness (D 43–56)
Total Today
00:00 / 2:00:00
Active Block
The Four Blocks
01
Pre-Session Read
00:00 → 15:00 · DRC §1 + §2 + SDL scan
15 min
Block 1 Elapsed 00:00 / 15:00
1
2
3
4
5
1
2
3
4
5
1
2
3
4
5
1
2
3
4
5
Risk Mode (computed)
Fill the 4 scales above. T = (Sleep + Energy + (6−Load) + (6−Distract)) / 4 → A / B / C / D / F.

Five hard fields only. No prose narrative on fallback days.
Long
Short
Neutral
Up
Flat
Down
Trending
Ranging
Transitional
Aligned
Conflict

60-second review of the Ban List + Cooldown status + yesterday's Locked Constraint.
Read Ban List headers (Classes A–E)5 classes, 30 bans · No active cooldown muting today
Verify no Cooldown activeAny T2+ in last 24/72h triggers a pause window
Re-read yesterday's Locked ConstraintThe single rule from DRC §6 of the prior day
02
Atlas Read + Setup Verdict
15:00 → 25:00 · Read-only Atlas · 7-condition check
10 min
Block 2 Elapsed 00:00 / 10:00
Setup 1
Setup 2
Setup 3
No Match
From Atlas §3 for the matched Setup ID. Each item is a single binary check. No interpretation.
Condition 1
Condition 2
Condition 3
Condition 4
Condition 5
Condition 6
Condition 7
Auto-Grade (7/7=A · 5–6=B · ≤4=C)
Tradeable
No-Trade · C Grade
No-Trade · No Setup
No-Trade · Risk Mode
Risk Mode D/F or C-grade detected. Tradeable verdict not permitted today.
Copy directly from Atlas. No reinterpretation on fallback days.
03
Core Execution
25:00 → 100:00 · Phase-dependent
75 min
Block 3 Elapsed 00:00 / 75:00

Setup window monitored / Replay advanced for full 75 minNo multi-tasking. Charts only.
TradingView alert set on Invalidation level (if Tradeable)SDL B5 enforced — no entry without alert
Trigger fired → entry executed per Pre-Trade PlanOR No-Trade case opened with categorized reason
Pre-Trade TCJ §1 written before chart advancedPhase 1 only — freeze-bar protocol
0
1
2
Phase 2 + 3 fallback day cap = 1 entry. Phase 1 cap = 2 short-hold cases.
04
EOD Closeout
100:00 → 120:00 · TCJ + DRC §5 + §6 + SDL audit
20 min
Block 4 Elapsed 00:00 / 20:00
Required within 60 min of exit for every taken trade. Skipping = T3 E3 breach.
§2 Post-Trade filled · Was Thesis Correct? R Realized? Exit Reason?
§3 Execution Quality scored · Hold Quality + 12-item breach checklist reviewed
§4 Outcome + Playbook implication logged · Plan Match (Full / Partial / Broken)

Yes
No
Yes
No
a. DRC complete (all mandatory sections)
b. Risk Mode obeyed (no override entries)
c. Pre-Trade Plan present (every trade)
d. Zero rule breaches
e. TCJ logged per trade
f. No Thesis Drift Level 3
Process Score (gate-relevant)
Adherence Score

1
2
3
4
5
Banned phrasing detected. Constraint must be specific, verifiable, and a single rule. Avoid "try harder", "be disciplined", "make money", etc.

All breaches from today logged in real timeRetro-logged breaches add a separate E4 (T1) flag
No Cooldown triggered (or new Cooldown acknowledged)
Minimum Acceptable Standard

Today's day is valid if and only if…

All 4 blocks executed in order, none skippedPENDING
DRC §1, §2, §5, §6 complete (4-of-4)PENDING
Risk Mode obeyed throughoutPENDING
SDL pre-session scan loggedPENDING
TCJ filed within 60 min for every tradePENDING
Process Score computed (not deferred)PENDING
Tomorrow's Locked Constraint written (verifiable)PENDING
Total elapsed 110 ≤ T ≤ 130 minPENDING
Reference · What Skips / What Doesn't

Allowed to Skip on Fallback Days

Never Skipped — Even in Fallback

DRC §1 Temperature Check — without Risk Mode nothing downstream is permitted
§2 — bias, regime, 4H structure, 1H structure, alignment (4 hard fields)
SDL pre-session scan + Cooldown check + yesterday's Constraint
Atlas 7-condition checklist on any taken Setup ID
TCJ within 60 min of exit — skipping = T3 E3 breach
DRC §5 EOD — Process Score computed, no partial fills
DRC §6 Locked Constraint — one verifiable rule, no exception
Real-time breach logging — Block 4 cannot batch missed breaches
Risk Mode obedience — C = A-grade only, D = observe, F = stand down
Max 3 trades / week cap — fallback does not reset the counter
Readiness Gate Impact

How fallback affects the 6 criteria

#1 Win Rate ≥ 45% (35+ cases)
Throughput slows. Phase 1 mostly fallback may need extension week to hit 35-case floor.
SLOWS
#2 Avg R:R ≥ 1.2
Unchanged — R:R set in Pre-Trade Plan, preserved on fallback.
UNAFFECTED
#3 Playbook complete + updated
Indirect risk — Atlas edits limited to Review Days; WR Fallback collapses §6 to summary-only.
INDIRECT
#4 Drawdown Protocol written
One-time field, unaffected.
UNAFFECTED
#5 Process Score ≥ 7 (×2 wks)
Fully achievable on clean fallback. Phase 3 fallback floor = 8/10.
ACHIEVABLE
#6 DRC every single day
Clean fallback = streak +1.
ACHIEVABLE
Hard rules ≥ 3 consecutive fallback days → Day 4 prompts time-availability audit · ≥ 14 fallback days in a phase → milestone re-evaluation · Phase 3 Week 8 → max 2 fallback days; a third defers Promotion Decision by 1 week.
Worked Examples
Good Fallback Day · Phase 2 · Day 35
Risk Mode B · 1 simulation entry · Process Score 9.5

07:00 → 07:15 · Block 1
Sleep 4 · Energy 3 · Cognitive Load 3 · Distractions 2 · Time 2h → T = 3.5 → Risk Mode B.
Bias: Long · BTC.D: Down · Regime: Trending · 4H: HH-HL · 1H: HH-HL · S/R 66,400 / 68,900 · Aligned.
SDL scan: no cooldown active. Yesterday's Constraint: "Set TradingView alert before any entry." Acknowledged.

07:15 → 07:25 · Block 2
Atlas open. Setup 1 (4H EMA50 Reclaim, Trend Continuation Long) matches.
7-condition checklist: 6/7 pass (C5 partial — driver narrative weaker). Grade B. Risk Mode B permits B-grade.
Atlas §5 inherited: Entry 67,100 · SL 66,400 · TP1 68,500 (2.0R) · Invalidation: 1H close below 66,400.

07:25 → 08:40 · Block 3
Monitor 1H for trigger candle. At 08:12 1H bullish engulfing closes above prior swing high.
Pre-Trade TCJ written in 4 min. Alert set at SL. Entry placed 67,140. Position size 0.5%.

08:40 → 09:00 · Block 4
Position still open at EOD. DRC §4: Hold Quality 4, Drift 1, 0 breaches.
DRC §5: Trades Taken 1, Matched Plan Y, TCJ Pre-Trade Y, Breaches 0 → Process Score 9.5/10. Adherence 100%.
§6: "Did well: Waited for 1H close, not wick. Differently: Pre-set TP2 in Atlas tomorrow. Constraint: Tomorrow I will not check the chart between 11:00 and 14:00 while position is open."
SDL audit clean.

Result: Clean fallback. DRC streak +1. Gate Criterion #6 on track. Process Score qualifies for Criterion #5.

Bad Fallback Day · Phase 2 · Day 36
5 SDL breaches · 72-hour Cooldown · streak broken

07:10 — Skipped Temperature scales. Wrote "feeling fine, 2h available" in §1. No Risk Mode computed.

07:15 — §2: "BTC looks bullish today." No bias / regime / structure / alignment. §2 incomplete.

07:18 — Skipped SDL scan. Class E process failure flagged at EOD audit.

07:25 — Atlas glance: "Setup 1 looks close enough." No 7-condition check. "Feels like 6/7." Class B6 breach.

07:40 — Saw BTC pumping. Entered without written Pre-Trade Plan. No SL set. B3 + B5 breaches (T3 + T1).

08:30 — Price reversed. Moved SL "to give it room." C1 breach (T3).

09:00 — Closed –1.4R. TCJ logged at 11:45 (2h45m after exit). Edited Thesis to read "BTC.D was rising." E4 (T1) + E5 (T3) + D3 (T3).

EOD — §6: "Bad day. Will try harder tomorrow." Banned phrasing. §6 rejected.
Process Score: components (a)/(c) zero, breach count 5. Process Score 1.5/10. Adherence 0%.

Result: Day incomplete in streak. 5 SDL breaches → 72-hour Cooldown. Gate Criterion #6 broken. Setup 1 flagged for demotion at next WR §6. Auto-Constraint Day 37: "No entries for 72h. Backtest + Atlas update only."